1

 

Integrated steam tracing distribution station and condensate collection station integrate steam distribution tube bundle, condensate recovery tube bundle, prefabricated insulation pipe and steam trap station. Compared with the traditional separate combined heat tracing station, the integrated steam heating distribution station and condensate collection station can realize standardized module design, avoid the tedious installation and processing, reduce potential welding leakage points, and reduce daily maintenance workload. With the characteristics of saving space, reducing cost and convenient installation, it is the preferred overall solution for heat tracing system, which can realize long-term energy saving and economic benefits for users.

 

 

 

1

 

 

 

FROTIK ENGINEERING EQUIPMENT CO.,LTD  combined the steam trap station and the collector are combined into one system, the condensate collection assembly. This all-in component has a number of outstanding advantages, including savings in assembly costs, flexibility in design, and reduced procurement and design time. Trap Station equipped with FBWZF Series steam Trap FBWZF Series Warranty for three years. The preassembly concept can avoid multi-component procurement and save transportation costs for multiple purchases orders. In addition, the time required for field assembly is greatly reduced. This modular forged steel assembly allows for quick assembly/delivery and reduces total project costs.